Miramar Regional Park

Chapel Trail
Pembroke Pines , Florida

Chapel trail is a 1,880 acre PUD located at U.S. Highway 27 and Pines Boulevard in Pembroke Pines.  This project is primarily residential with industrial parcels.  The project consisted of roadway design, a master sewage pump station and sewage collection system, drainage and water distribution system.  The development parcels include single-family projects, light industrial projects, a shopping center and a City park. 

The Chappell Group, Inc. assisted CTA with the processing of the wetland permits with the U.S. Army Corps of Engineers, South Florida Water Management District and Broward County Environmental Protection Department (BCEPD) including the permitting and monitoring of the first wetland regeneration area approved by Broward County.  This involved the backfilling of excavated lakes with muck and then planting these areas with wetland species.

Contact
Mr. Howard Zimmerman
H.J. Zimmerman & Associates, Inc.
12555 Orange Drive, Suite 100
Davie, Florida  33330
Phone: (954) 862-1440

Construction Cost
$100,000,000.00

Download this profile

<- back to Services
spacer


Home | About | Services | Projects | Clients | Download | Contact

© 2008 The Chappell Group, Inc. All rights reserved
Designed by: zaid-designs.com