Heron Bay
Coral Sprongs, Florida

The Chappell Group, Inc. (TCG) provided and continues to provide environmental services for the design and construction of numerous dredge/fill projects requiring mitigation within the Heron Bay community.

Environmental services included Preliminary Wetland Assessment reports, Due Diligence reports, and Jurisdictional Determinations with agencies including design services for dredge and fill projects.  The Chappell Group, Inc. also inspected the dredge and fill projects and review of mitigation as required.

Permitting services included expediting the permitting process through the U.S. Army Corps of Engineers, South Florida Water Management District, Broward County Environmental Protection Department and the water control districts.

Contact
Mr. Bob Ditthardt
WCI Communities, Ltd.
11575 Heron Bay Boulevard, Suite 200
Coral Springs, Florida  33076
(954) 575-4200

Construction Cost
$50,000,000.00

Download this profile

<- back to Services
spacer


Home | About | Services | Projects | Clients | Download | Contact

© 2008 The Chappell Group, Inc. All rights reserved
Designed by: zaid-designs.com